Sections Drawings List

Search Standard Drawings

Power Supply Volumes - Vol 01 - Overhead Line Manual - Section 2 - Construction Drawings

Sort by
Drawing Title Amendment # Amendment Date
S01-02-01-01 ASSEMBLIES MAIN AND SERVICE CONNECTIONS AND TERMINATIONS (1.9 MB) 16 12/2018
S01-02-01-02 ASSEMBLIES LINE TILES (78.8 KB) 4 12/2018
S01-02-01-03 ASSEMBLIES LV CONDUCTORS LINE PIN AND SHACKLE INSULATOR (1.9 MB) 10 04/2019
S01-02-01-06 ASSEMBLIES LV DEVIATION LINE PIN & SHACKLE INSULATORS (1.5 MB) 1 12/2018
S01-02-01-08 ASSEMBLIES SERVICE TERMINATION DOUBLE INSULATED (1.8 MB) 8 05/2020
S01-02-01-10 ASSEMBLIES WARNING MARKER AIRCRAFT (56.1 KB) 4 12/2018
S01-02-01-12 ASSEMBLIES SERVICE TERMINATION, BOLTED CONNECTIONS, DOUBLE INSULATED (124.6 KB) 4 12/2018
S01-02-01-17 ASSEMBLIES INSULATORS ON HV 'A TOP' FOR UNIVERSAL POLE CONSTRUCTION (110.1 KB) 3 04/2019
S01-02-01-18 ASSEMBLIES INSULATORS ON HV 'B TOP' FOR UNIVERSAL POLE CONSTRUCTION (85.8 KB) 2 04/2019
S01-02-01-19 ASSEMBLIES INSULATORS ON LV 'a TOP' FOR UNIVERSAL POLE CONSTRUCTION (63.7 KB) 1 12/2018
S01-02-01-20 ASSEMBLIES INSULATORS ON LV 'c TOP' FOR UNIVERSAL POLE CONSTRUCTION (65.4 KB) 1 12/2018
S01-02-01-21 ASSEMBLIES INSULATORS ON LV 'b TOP' FOR UNIVERSAL POLE CONSTRUCTION (54.7 KB) 1 12/2018
S01-02-01-22 ASSEMBLIES OVERHEAD EARTH WIRE - LINE POLE FOR UNIVERSAL POLE CONSTRUCTION (199.5 KB) 4 12/2018
S01-02-01-23 ASSEMBLIES, O/H EARTH WIRE TERMINATION AND DEVIATION POLE FOR UNIVERSAL POLE CONSTRUCTION (107.2 KB) 5 04/2018
S01-02-01-24 ASSEMBLIES, OVERHEAD EARTH WIRE INSULATORS ON HV 'B TOP' FOR UNIVERSAL POLE CONSTRUCTION (88.0 KB) 4 12/2018
S01-02-01-25 POLE TOP UNITS VERTICLE ANGLE FOR UNIVERSAL POLE CONSTRUCTION (68.8 KB) 1 12/2018
S01-02-01-26 ASSEMBLIES ALLEY ARM FOR UNIVERSAL POLE CONSTRUCTION (1.7 MB) 4 10/2020
S01-02-01-27 ASSEMBLIES EARTHING CMEN UNDERSLUNG EARTH FOR UNIVERSAL POLE CONSTRUCTION (74.0 KB) 2 01/2019
S01-02-01-28 ASSEMBLIES INSULATORS ON LV 'd TOP' FOR UNIVERSAL POLE CONSTRUCTION (61.3 KB) 2 01/2019
S01-02-01-29 ASSEMBLIES LV - ABC - BOLTED CONNECTIONS 1 - 2 SERVICES INTERMEDIATE SUSPENSION (116.4 KB) 1 04/2019
S01-02-01-30 ASSEMBLIES LV - ABC - BOLTED CONNECTIONS 3 - 4 SERVICES INTERMEDIATE SUSPENSION (127.2 KB) 1 04/2019
S01-02-01-31 ASSEMBLIES LV - ABC - BOLTED CONNECTIONS LINK POLE - OPEN JOINT (123.5 KB) 2 01/2019
S01-02-01-32 ASSEMBLIES LV - ABC - BOLTED CONNECTIONS SUSPENSION TEE OFF (114.5 KB) 2 01/2019
S01-02-01-33 ASSEMBLIES LV - ABC - BOLTED CONNECTIONS STREET LIGHT SHORT OUTREACH INTERMEDIATE SUSPENSION (1.7 MB) 3 01/2019
S01-02-01-34 ASSEMBLIES LV - ABC - BOLTED CONNECTIONS INTERMEDIATE SUSPENSION (81.1 KB) 2 01/2019
S01-02-01-35 ASSEMBLIES LV - ABC - BOLTED CONNECTIONS NON - TENSION JOINT (99.5 KB) 2 01/2019
S01-02-01-37 ASSEMBLIES SUSPENSION CONSTRUCTION 22KV FOR UNIVERSAL POLE CONSTRUCTION (110.5 KB) 2 01/2019
S01-02-01-39 ASSEMBLIES FOR UNIVERSAL POLE CONSTRUCTION HV SURGE DIVERTER X-ARM ASSY & RECLOSER BRACKET (94.3 KB) 7 01/2019
S01-02-01-43 ASSEMBLIES SUSPENSION CONSTRUCTION 22KV (TERMINATION) FOR UNIVERSAL POLE CONSTRUCTION (94.5 KB) 3 01/2019
S01-02-01-44 ASSEMBLIES- BOLTED CONNECTIONS STREETLIGHTING ATTACHMENT DETAILS (104.5 KB) 4 01/2019
S01-02-01-45 ASSEMBLIES LV - ABC - BOLTED CONNECTIONS STREET LIGHT LONG OUTREACH INTERMEDIATE SUSPENSION (87.5 KB) 1 01/2019
S01-02-01-46 ASSEMBLIES 22KV WISHBONE ARRANGEMENT FOR UNIVERSAL POLE CONSTRUCTION (105.0 KB) 2 01/2019
S01-02-01-47 ASSEMBLIES LINE - RISER (MAX 5 DEGREES DEVIATION) BOLTED CROSS ARM ATTACHMENT TO WELDED POLES (86.7 KB) 3 01/2019
S01-02-01-49 ASSEMBLIES CROSSARM BRACES AND DETAILS FOR UNIVERSAL POLE CONSTRUCTION (78.1 KB) 7 01/2019
S01-02-01-50 ASSEMBLIES SUSPENSION CONSTRUCTION 22KV WITH TRANSFORMER (1.9 MB) 5 01/2019
S01-02-01-51 ASSEMBLIES FOR UNIVERSAL POLE CONSTRUCTION POLE TOP MOUNTED GAS BREAK SWITCH (2.5 MB) 3 10/2020
S01-02-01-52 ASSEMBLIES. INSULATORS ON H/V, C TOP FOR UNIVERSAL POLE CONSTRUCTION. (1.5 MB) 6 01/2019
S01-02-01-69 ASSEMBLIES BOLTED LINE POLE CONSTRUCTION (2.7 MB) 2 01/2019
S01-02-01-70 ASSEMBLIES INSULATORS ON HV D TOP (1.4 MB) 2 01/2019
S01-02-01-71 POWER POLE STRUCTURES CCTV INSTALLATION (122.3 KB) 1 01/2019
S01-02-01-72 TELSTRA MOBILE ANTENNA INSTALLATION (3.7 MB) 1 10/2020
S01-02-01-73 ASSEMBLIES BOLTED CONNECTION STREETLIGHT WITH PE CELL ON OPEN WIRE SYSTEMS (2.2 MB) 0 09/2019

Browse other Power Supply Volumes