Sections Drawings List

Search Standard Drawings

Power Supply Volumes - Vol 02 - Underground Manual - Section 2 - Construction Drawings

Sort by
Drawing Title Amendment # Amendment Date
S02-02-06-01 CIVIL ROAD CROSSING AND TRENCHING NOTES ALL AREAS (415.5 KB) 12 05/2020
S02-02-06-02 CIVIL TRENCH SECTIONS IN FOOTPATH ALLOCATION ALL AREAS (198.1 KB) 12 06/2019
S02-02-06-03 CIVIL TRENCH SECTIONS OUTSIDE OF FOOTPATH ALLOCATION ALL AREAS (89.2 KB) 13 06/2019
S02-02-06-09 CIVIL PACKAGE SUBSTATION CABLE ENTRY AND FOUNDATION DETAILS (1.8 MB) 21 11/2020
S02-02-06-10 STANDARD CABLE PIT PLANS AND DETAILS (87.7 KB) 2 02/2019
S02-02-06-12 DOUBLE TRANSFORMER SUBSTATION TRENCH AND DUCT LAYOUT (1.5 MB) 6 04/2019
S02-02-06-13 INDOOR SUBSTATION 1000KVA MAXIMUM CONSTRUCTION DETAILS (1.5 MB) 8 04/2019
S02-02-06-14 INDOOR SUBSTATION DUCTS, DRAINAGE & UNISTRUTS ARRANGEMENT & DETAILS (2.0 MB) 5 04/2019
S02-02-06-15 CIVIL INDOOR SUBSTATION CONSTRUCTION NOTES (72.9 KB) 5 02/2019
S02-02-06-16 CIVIL CABLE ROUTE MARKERS (109.4 KB) 10 02/2019
S02-02-06-17 CIVIL SUBSTATION EASEMENT DETAILS HV & LV EQUIPMENT (59.4 KB) 9 03/2020
S02-02-06-18 CIVIL H.V. CONSUMERS SWITCHING STATION - METERING ROOM CONSTRUCTION DETAILS (862.8 KB) 2 07/2020
S02-02-06-19 HV CONSUMERS SWITCHING STATION METERING ROOM CONSTRUCTION NOTES (1.3 MB) 3 05/2020
S02-02-06-22 CIVIL CHAINWIRE MESH SECURITY FENCE WITH TOP AND BOTTOM RAILS (363.5 KB) 2 02/2019
S02-02-06-23 CIVIL RING MAIN UNIT 4 WAY RM6 FOUNDATION DETAIL (1.4 MB) 3 02/2019
S02-02-06-27 CIVIL CABLE ROUTE MARKERS KERB (684.1 KB) 2 05/2020
S02-02-06-28 CIVIL BOLLARDS FOUNDATION DETAIL (1.4 MB) 1 07/2019
S02-02-06-32 CIVIL, SCHNEIDER SM6 SWITCHING AND INTAKE STATION, FOUNDATION DETAILS (135.2 KB) 3 02/2019
S02-02-06-33 GROUND LEVEL DETAILS, PACKAGE SUBSTATIONS AND RING MAIN UNITS (104.2 KB) 5 06/2020
S02-02-06-34 DRIESCHER RMU, CABLE ENTRY AND FOUNDATION DETAILS (116.6 KB) 1 02/2019
S02-02-06-35 CIVIL, 75KA SINGLE PHASE UNDERGROUND DISTRIBUTION SUBSTATION, FOUNDATION DETAILS (57.4 KB) 3 11/2020
S02-02-06-36 CIVIL, CABLE CLAMPING ARRANGEMENTS IN FOUNDATION SLABS (607.2 KB) 2 02/2019
S02-02-06-37 CIVIL MK3 PACKAGE SUBSTATION CABLE ENTRY AND FOUNDATION DETAILS (501.5 KB) 4 02/2020
S02-02-06-38 CABLE TURNING PIT GENERAL ARRANGEMENT (911.6 KB) 2 10/2019
S02-02-06-39 CABLE JOINT PIT GENERAL ARRANGEMENT (457.3 KB) 3 07/2020
S02-02-06-40 MK3 PACKAGE SUBSTATION CONDUIT LOCATION JIG WITH MK3 SLAB (216.4 KB) 2 02/2019
S02-02-06-41 CIVIL, MK3 PACKAGE SUBSTATION PRECAST SLAB (834.1 KB) 2 02/2019
S02-02-06-42 MK3 PACKAGE SUBSTATION CABLE ENTRY AND FOUNDATION DETAILS WITH MK2 SLAB (115.1 KB) 1 02/2019
S02-02-06-43 MK3 PACKAGE SUBSTATION CONDUIT LOCATION JIG WITH MK2 SLAB (214.0 KB) 2 02/2019
S02-02-06-44 CIVIL ANTI-CLIMBING FENCE CAT 3 - HIGH RISK AREAS (825.6 KB) 1 02/2019
S02-02-06-45 CIVIL ANTI-CLIMBING FENCE CAT 2 - MEDIUM RISK AREAS (711.7 KB) 1 02/2019
S02-02-06-47 CIVIL, FOUNDATION SLAB, 7000 SERIES PACKAGE SUBSTATION PRECAST SLAB CONCRETE, PLAN AND SECTIONS (76.9 KB) 0 11/2020
S02-02-06-48 CIVIL, FOUNDATION SLAB, SCHNEIDER RM6 RING MAIN UNIT, PRE-CAST SLAB CONCRETE, PLAN AND SECTIONS (109.1 KB) 0 11/2020
Drawing Title Amendment # Amendment Date
S02-02-07-12 INDOOR SUBSTATION ONE TRANSFORMER ARRANGEMENTSURFACE CHAMBER LAYOUT OPTIONS PLAN (234.9 KB) 4 02/2019
S02-02-07-13 INDOOR SUBSTATION ONE TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 1 CONSTRUCTION DETAILS SHEET 1 OF 3 (1.7 MB) 5 10/2020
S02-02-07-14 INDOOR SUBSTATION ONE TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 1 CONSTRUCTION DETAILS SHEET 2 OF 3 (243.3 KB) 2 02/2019
S02-02-07-15 INDOOR SUBSTATION ONE TRANSFORMER ARRANGEMENT SURFACE CHAMBER CONSTRUCTION DETAILS SHEET 3 OF 3 (1.2 MB) 3 10/2020
S02-02-07-16 INDOOR SUBSTATION ONE TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 2 CONSTRUCTION DETAILS SHEET 1 OF 3 (1.7 MB) 5 10/2020
S02-02-07-17 INDOOR SUBSTATION ONE TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 2 CONSTRUCTION DETAILS SHEET 2 OF 3 (239.1 KB) 2 02/2019
S02-02-07-18 INDOOR SUBSTATION ONE TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 2 CONSTRUCTION DETAILS SHEET 3 OF 3 (1.2 MB) 3 10/2020
S02-02-07-19 INDOOR SUBSTATION ONE TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 3 CONSTRUCTION DETAILS SHEET 1 OF 3 (1.8 MB) 5 10/2020
S02-02-07-20 INDOOR SUBSTATION ONE TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 3 CONSTRUCTION DETAILS SHEET 2 OF 3 (241.2 KB) 2 02/2019
S02-02-07-21 INDOOR SUBSTATION ONE TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 3 CONSTRUCTION DETAILS SHEET 3 OF 3 (1.2 MB) 3 10/2020
S02-02-07-24 INDOOR SUBSTATION TWO TRANSFORMER ARRANGEMENT SURFACE CHAMBER LAYOUT OPTIONS PLAN (146.2 KB) 2 02/2019
S02-02-07-25 INDOOR SUBSTATION TWO TRANSFORMER ARRANGEMENT TWO TRANSFORMER ARRANGEMENT CONSTRUCTION DETAILS SHEET 1 OF 3 (1.7 MB) 5 10/2020
S02-02-07-26 INDOOR SUBSTATION TWO TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 1 CONSTRUCTION DETAILS SHEET 2 OF 3 (213.6 KB) 2 02/2019
S02-02-07-27 INDOOR SUBSTATION TWO TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 1 CONSTRUCTION DETAILS SHEET 3 OF 3 (2.3 MB) 5 10/2020
S02-02-07-28 INDOOR SUBSTATION TWO TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 2 CONSTRUCTION DETAILS SHEET 1 OF 3 (2.8 MB) 5 10/2020
S02-02-07-29 INDOOR SUBSTATION TWO TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 2 CONSTRUCTION DETAILS SHEET 2 OF 3 (102.9 KB) 2 02/2019
S02-02-07-30 INDOOR SUBSTATION TWO TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 2 CONSTRUCTION DETAILS SHEET 3 OF 3 (2.0 MB) 3 10/2020
S02-02-07-31 INDOOR SUBSTATION TWO TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 3 CONSTRUCTION DETAILS SHEET 1 OF 3 (2.8 MB) 5 10/2020
S02-02-07-32 INDOOR SUBSTATION TWO TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 3 CONSTRUCTION DETAILS SHEET 2 OF 3 (99.4 KB) 2 02/2019
S02-02-07-33 INDOOR SUBSTATION TWO TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION CONSTRUCTION DETAILS SHEET 3 OF 3 (2.0 MB) 3 10/2020
S02-02-07-34 INDOOR SUBSTATION THREE TRANSFORMER ARRANGEMENT SURFACE CHAMBER LAYOUT OPTIONS PLAN (149.0 KB) 2 02/2019
S02-02-07-35 INDOOR SUBSTATION THREE TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 1 CONSTRUCTION DETAILS SHEET 1 OF 4 (3.2 MB) 4 10/2020
S02-02-07-36 INDOOR SUBSTATION THREE TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 1 CONSTRUCTION DETAILS SHEET 2 OF 4 (101.5 KB) 2 02/2019
S02-02-07-37 INDOOR SUBSTATION THREE TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 1 CONSTRUCTION DETAILS SHEET 3 OF 4 (114.9 KB) 3 02/2019
S02-02-07-38 INDOOR SUBSTATION THREE TRANSFORMER ARRANGEMENT SURFACE CHAMBER - OPTION 1 CONSTRUCTION DETAILS SHEET 4 OF 4 (2.1 MB) 3 10/2020
S02-02-07-39 THREE TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 2 CONSTRUCTION DETAILS SHEET 1 OF 3 (3.0 MB) 5 10/2020
S02-02-07-40 THREE TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 2 CONSTRUCTION DETAILS SHEET 2 OF 3 (135.4 KB) 3 02/2019
S02-02-07-41 THREE TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 2 CONSTRUCTION DETAILS SHEET 3 OF 3 (2.3 MB) 3 10/2020
S02-02-07-42 THREE TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 3 CONSTRUCTION DETAILS SHEET 1 OF 3 (2.9 MB) 5 10/2020
S02-02-07-43 THREE TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 3 CONSTRUCTION DETAILS SHEET 2 OF 3 (140.7 KB) 3 02/2019
S02-02-07-44 THREE TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 3 CONSTRUCTION DETAILS SHEET 3 OF 3 (2.2 MB) 3 10/2020
S02-02-07-45 INDOOR SUBSTATION CABLE PULLING EYE DETAIL (156.5 KB) 3 02/2019
S02-02-07-46 INDOOR SUBSTATION EARTHING LAYOUT SHEET 1 OF 2 (203.2 KB) 5 02/2019
S02-02-07-47 INDOOR SUBSTATION EARTHING LAYOUT SHEET 2 OF 2 (147.0 KB) 3 02/2019
S02-02-07-48 INDOOR SUBSTATION LV CONNECTION DETAILS (112.8 KB) 7 02/2020
S02-02-07-49 INDOOR SUBSTATION INDIVIDUAL TRANSFORMER LV CONNECTION DETAILS (129.7 KB) 4 02/2019
S02-02-07-50 ONE TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 1 MISCELLANEOUS DETAILS (1.9 MB) 4 10/2020
S02-02-07-51 ONE TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 2 MISCELLANEOUS DETAILS (1.7 MB) 5 10/2020
S02-02-07-52 TWO TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 1 MISCELLANEOUS DETAILS (1.8 MB) 5 10/2020
S02-02-07-53 TWO TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 3 MISCELLANEOUS DETAILS (2.0 MB) 4 10/2020
S02-02-07-54 THREE TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 1 MISCELLANEOUS DETAILS (2.2 MB) 4 10/2020
S02-02-07-55 THREE TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 2 MISCELLANEOUS DETAILS (2.2 MB) 4 10/2020
S02-02-07-56 THREE TRANSFORMER INDOOR SUBSTATION SURFACE CHAMBER - OPTION 3 MISCELLANEOUS DETAILS (2.0 MB) 5 10/2020
S02-02-07-57 RM6 RING MAIN UNIT 3 AND 4 FUNCTION MOUNTING FRAME (202.2 KB) 2 02/2019
S02-02-07-58 ONE T/FORMER INDOOR SUBSTATION SURFACE CHAMBER OPTION 3 MISC. DETAILS (2.6 MB) 3 07/2020
S02-02-07-59 TWO T/FORMER INDOOR SUBSTATION SURFACE CHAMBER OPTION2 MISC. DETAILS (706.3 KB) 3 07/2020
S02-02-07-60 ALUMINIUM EQUIPMENT DOORS WITH LOUVRES FOR CONTROL POINT CABLE OR CABLE RISER (145.4 KB) 2 02/2019
S02-02-07-61 UPPER LEVEL SUBSTATION CHAMBERS DEDICATED ACCESSWAY/ SMALL EQUIPMENT ACCESS OPTION A AND B (184.9 KB) 1 02/2019
S02-02-07-62 INDOOR SUBSTATIONS LV CABLE LADDER ARRANGEMENTS (973.1 KB) 2 02/2019
S02-02-07-63 UPPER LEVEL SUBSTATION CHAMBERS BALUSTRADE DETAILS (182.5 KB) 1 02/2019
S02-02-07-64 UPPER LEVEL SUBSTATION CHAMBERS SINGLE TRANSFORMER ARRANGEMENT EXAMPLE (193.8 KB) 1 02/2019

Browse other Power Supply Volumes