Current outages and works

If you see a life-threatening or dangerous situation such as a powerline on the ground,
call 000 or the Power and Water emergency line on 1800 245 090 immediately.

Our top priority is making sure the community and our employees are safe while responding to faults and outages affecting our power, water and sewerage services.

View the schedule for our upcoming planned works.

- planned   works
- unplanned   outages
Works or Outages
Location
Outage Details
Outage Type
Details
Order No.
Start/End
Start
Estimated End
Darwin - rural Dundee Beach
Power 👷‍♂️ 9:25pm - Crews patrolling lines. Estimated time of restoration is 10pm.
👷‍♂️ 11:18pm - Crews working to safely repair damage. Estimated time of restoration is 1am.
👷‍♂️ 11:36pm - Crews working to safely repair damage. Estimated time of restoration is 3am.
⚠️Power interruption affecting areas of Dundee Beach #DarwinRuralNT. Estimated time of restoration is 10pm.
Power
👷‍♂️ 9:25pm - Crews patrolling lines. Estimated time of restoration is 10pm.
👷‍♂️ 11:18pm - Crews working to safely repair damage. Estimated time of restoration is 1am.
👷‍♂️ 11:36pm - Crews working to safely repair damage. Estimated time of restoration is 3am.
⚠️Power interruption affecting areas of Dundee Beach #DarwinRuralNT. Estimated time of restoration is 10pm.
Wed 17 Apr 08:16pm
Unknown
Wed 17 Apr 08:16pm
Unknown
Darwin - city and suburbs Stuart Park
Power ⚠️Power interruption affecting areas of Stuart Park #DarwinNT. Estimated time of restoration is 1am.
Power
⚠️Power interruption affecting areas of Stuart Park #DarwinNT. Estimated time of restoration is 1am.
Wed 17 Apr 11:25pm
Unknown
Wed 17 Apr 11:25pm
Unknown
Planned Work
Darwin - city and suburbs Woolner
Power We will be inspecting power service lines around Woolner from 2 - 30 April 2024. To safely complete the inspections our crews will use GOPRO cameras and may need to enter your property. An inspection generally takes less than 20 minutes and does not need to interrupt your power supply.
Power
We will be inspecting power service lines around Woolner from 2 - 30 April 2024. To safely complete the inspections our crews will use GOPRO cameras and may need to enter your property. An inspection generally takes less than 20 minutes and does not need to interrupt your power supply.
Tue 02 Apr 09:00am
Tue 30 Apr 04:00pm
Tue 02 Apr 09:00am
Tue 30 Apr 04:00pm

Bishop Street
Charlton Court
Damaso Place
Iliffe Street
Jolly Street
Snell Street

Planned Work
Alice Springs and Central Desert Alice SpringsBraitling
Water Water supply maybe interrupted for maintenance works. #1660163
Water
Water supply maybe interrupted for maintenance works.
#1660163
Thu 21 Mar 09:00am
Thu 21 Mar 12:00pm
Thu 21 Mar 09:00am
Thu 21 Mar 12:00pm

Dixon Rd  - 70

Planned Work
Darwin - city and suburbs Bayview
Power
Cable replacement works will take place in Gunbar Street, Bayview: Monday 28 September to November 2023 8am to 5pm Monday to Friday 9am to 4pm Saturday When works are complete there may be a short power interruption to connect the new cable. We will notify you when this will take place.
Power

Cable replacement works will take place in Gunbar Street, Bayview: Monday 28 September to November 2023 8am to 5pm Monday to Friday 9am to 4pm Saturday When works are complete there may be a short power interruption to connect the new cable. We will notify you when this will take place.
Mon 19 Feb 08:00am
Tue 30 Apr 05:00pm
Mon 19 Feb 08:00am
Tue 30 Apr 05:00pm
Thumbs up ico

There are currently no outages in your area!

View future planned works

Report outages and interruptions

Our crews are prepared to respond and restore services as safely and quickly as possible.

Planned works

We undertake regular maintenance and upgrades to reduce the number of unplanned outages and issues in future.

Report a fault

Please run through our quick fault checklist to see if you need to report a fault to us.