Planned works and interruptions to services are listed below. Motorists and pedestrians are advised to follow warning signs around the affected areas. We thank you for your cooperation and understanding. For more information please call 1800 245 092. You can also follow PowerWaterCorp on Twitter. See our Planned works program page for more information.

If you see a faulty street light or one that is on during the day, call 1800 245 092 or complete the online form. Note the number on the pole to help us identify it. The sooner you let us know, the sooner we can fix it.

If you see Power and Water infrastructure that appears damaged or out of place, email customerservice@powerwater.com.au, complete our feedback form or call us on 1800 245 092.

In an emergency, call 1800 245 090 any time.

If it's not a life-threatening situation involving power, water or sewerage call Power and Water’s general enquiries number. That way you won’t be preventing crews from responding to an emergency. Call 1800 245 092 for all power, water and sewerage non-emergency situations.

Filter by suburb:

 

 

Outage Type Location Description / Time
Power Works Darwin
DARWIN CITY
Start: Thursday 02 January 00:00
End: Wednesday 30 April 00:00

Description:

McMinn Street Service Road, Darwin is closed at the Power and Water substation (50 McMinn Street) until the end of April.

The road closure will allow for a concrete cable tunnel to be installed.

Access to McMinn Street Service Road remains via Day and Barneson Streets.

For more information call the Project Manager on 0428 140 434.

Power Works Darwin
TIWI
Start: Monday 10 March 07:30
End: Friday 16 May 16:30

Description:

Civil works to install new conduits and cables between Roper and Jinka Street, Tiwi are continuing.

The work involves trenching through the footpath and some driveways will be inaccessible for short periods.

For more information contact the Project Manager on 8924 5186.

Power Works Darwin
GRAY
Start: Tuesday 01 April 07:30
End: Monday 30 June 16:00

Description:

Works to relocate street lights and install power distribution pillars will occur at:

  • Bacon Street
  • Bagshaw Crescent
  • Dunbar Street
  • Luther Court
  • Minorelli Court
  • Raffles Road
  • Scammell Court
  • Timpson Court
Power Works Darwin
MOULDEN
Start: Tuesday 01 April 07:30
End: Monday 30 June 16:00

Description:

Works to relocater street lights and install power distribution pillars will occur at:

  • Bonson Terrace
Power Works Darwin
DRIVER
Start: Tuesday 01 April 07:30
End: Monday 30 June 16:00

Description:

Works to relocate street lights and install power distribution pillars will occur at:

  • Dwyer Circuit
Power Works Darwin
DARWIN CITY
Start: Monday 07 April 08:00
End: Monday 28 April 16:30

Description:

Works to install new power cables will occur at:

  • Smith Street 130, 132, 140, 144
  • Dashwood Crescent 14-20
  • Mauna Loa Street 8

The works will involve trenching through the verge and some driveways will be inaccessible for short periods. Traffic management will be in place. For more information contact the Project Manager on 8924 5186.

 

Sewer Works Darwin
FANNIE BAY
RAPID CREEK
TIWI
WAGAMAN
WANGURI
Start: Monday 31 March 07:30
End: Wednesday 30 April 16:00

Description: Descaling works will be carried out in Fannie Bay, Rapid Creek, Tiwi, Wagaman and Wanguri.
Sewer Works Darwin
ALAWA
Start: Monday 31 March 07:30
End: Wednesday 30 April 16:00

Description:

Sewer relining works will take place in Alawa.

 

Tree Trimming Darwin
ADELAIDE RIVER
BURRUNDIE
COCONUT GROVE
DUNDEE BEACH
HUMPTY DOO
JINGILI
WINNELLIE
YARRAWONGA
Start: Monday 14 April 00:00
End: Saturday 26 April 00:00

Description:

Tree trimming will be taking place in Coconut Grove, Jingili, Winnellie and Yarrawonga.

If vegetation is close to powerlines it is critical that residents do not try to clear it themselves. Contact us before pruning so we can advise you on the safest way to do this.

Tree Trimming Tennant Creek
TENNANT CREEK
Start: Monday 14 April 00:00
End: Saturday 26 April 00:00

Description:

Tree trimming will be taking place in Tennant Creek.

If vegetation is close to powerlines it is critical that residents do not try to clear it themselves. Contact us before pruning so we can advise you on the safest way to do this.

Water Works Darwin
DARWIN RIVER DAM
Start: Tuesday 08 April
End: Wednesday 30 April

Description:

Controlled burning of the Darwin River Dam catchment area is being undertaken to reduce the risk of uncontrolled fires in the catchment area later in the dry season.

For enquiries about the burning operations please contact Bushfires NT on 8976 0098.