| Contract details | |
|---|---|
| Contract number | WPO00159-24 |
| Business unit owner | Core Operations |
| Contract dates | 1 November 2025 to 31 October 2028 |
About this contract
This panel contract has been formed to facilitate the provision of maintenance and repair works to IES’s generation infrastructure, as well as installation and new works as required to maintain the integrity of these systems in remote communities. A general outline of the work to be carries out under the Contract comprises, but is not limited to mechanical/ electrical installation of diesel generating sets, ranging from 50kw to 3 megawatt electrical output, including remote radiators/ stands and walkways and exhaust, fuel, pneumatic and oil systems.
This panel contract has been established for a period of 36 months, commencing from 1 November 2025, with a total of five (5) panellists across Northern, Katherine and Southern region.
| Name | Location |
|---|---|
| E.P.G. Solutions Pty Ltd | Northern Region |
| Micca Holdings Pty Ltd T/as Micks Ally Fab | Northern Region |
| Terrirtory Engineering Pty Ltd | Northern Region |
| Micca Holdings Pty Ltd T/As Micks Ally Fab | Katherine Region |
| Territory Engineering Pty Ltd | Katherine Region |
| E.P.G. Solutions Pty Ltd | Southern Region |
| HD Repairs | Southern Region |
Additional panellists can be considered for inclusion at Power and Water’s discretion.
Appointment of additional members to the panel would be under the same assessment criteria contained in the original Request for Tender.
Contact details
For more information about this panel contract, please contact pwc.procurement@powerwater.com.au