View your results
-
S01-01-04-30 LINE HARDWARE CABLE PROTECTION CHANNEL
standard-drawing POWER Amendment number 11 Amendment date 20-06-2025 Last updated 20-06-2025Power Supply Volumes » Vol 01 - Overhead Line Manual » Section 1 - Materials » Line Hardware -
W1-2-05B_3-Mainlaying-Thrust-Block-Details-for-DN150-to-DN450-Pressure-Main.PDF
standard-drawing Amendment number 4 Amendment date 01-12-2024 Last updated 13-06-2025Power Supply Volumes » Vol 01 - Water Supply Standard Drawings » Section 2 - Mainlaying » -
W1-2-05 Thrust Block & Trench Details for DN 100 - 225 Pressure Main
standard-drawing WATER Amendment number 4 Amendment date 01-12-2024 Last updated 13-06-2025Power Supply Volumes » Vol 01 - Water Supply Standard Drawings » Section 2 - Mainlaying » -
S01-02-07-11 ASSEMBLIES FOR UNIVERSAL POLE CONSTRUCTION SF6 GAS LOAD BREAK SWITCH (3 SHEETS)
standard-drawing POWER Amendment number 25 Amendment date 27-05-2025 Last updated 27-05-2025Power Supply Volumes » Vol 01 - Overhead Line Manual » Section 2 - Construction Drawings » Switchgear -
S04-02-01-24 LV ABC, POLE TOP UNITS, BOLTED POLE CONSTRUCTION, SUSPENSION ANGLE TEE-OFF, ROAD SIDE
standard-drawing POWER Amendment number 3 Amendment date 01-05-2025 Last updated 27-05-2025Power Supply Volumes » Vol 04 - Aerial Bundled Cable Manual » Section 2 - Construction Drawings » Assemblies -
S04-02-04-04 LV ABC SUBSTATION CONNECTION, QUAD CIRCUIT
standard-drawing POWER Amendment number 7 Amendment date 01-05-2025 Last updated 27-05-2025Power Supply Volumes » Vol 04 - Aerial Bundled Cable Manual » Section 2 - Construction Drawings » Cable Termination -
S04-02-04-03 LV ABC SUBSTATION CONNECTION, TWIN CIRCUIT
standard-drawing POWER Amendment number 8 Amendment date 01-05-2025 Last updated 27-05-2025Power Supply Volumes » Vol 04 - Aerial Bundled Cable Manual » Section 2 - Construction Drawings » Cable Termination -
S04-02-04-02 LV ABC SUBSTATION CONNECTION, SINGLE CIRCUIT
standard-drawing POWER Amendment number 10 Amendment date 01-05-2025 Last updated 27-05-2025Power Supply Volumes » Vol 04 - Aerial Bundled Cable Manual » Section 2 - Construction Drawings » Cable Termination -
S02-02-07-10 SWITCHING STATION - METERING ROOM SWITCHGEAR LAYOUT
standard-drawing POWER Amendment number 7 Amendment date 26-05-2025 Last updated 26-05-2025Power Supply Volumes » Vol 02 - Underground Manual » Section 2 - Construction Drawings » Switching Station Drawings 9 to 11 -
S02-02-06-32 CIVIL, SCHNEIDER SM6 SWITCHING AND INTAKE STATION, FOUNDATION DETAILS
standard-drawing POWER Amendment number 5 Amendment date 26-05-2025 Last updated 26-05-2025Power Supply Volumes » Vol 02 - Underground Manual » Section 2 - Construction Drawings » Civil