Procedural requirements

These documents outline the procedures proponents must comply with during development.

General Procedures for Development Activity 2013 is a general guide for development activity.

Fact sheets and guides

These documents further help proponents meet Power and Water's procedural requirements. A number of these fact sheets have both technical and procedural elements and appear on both the Technical and Procedural Requirement pages.

Customer Information Handout 1
Standard Notes for Water and Sewer Services for Building Developments, Extensions and Subdivisions;

Customer Information Handout 2
Drawing Checklist for Water and Sewer Drawings for Building Developments, Extensions and Subdivisions;

Customer Information Handout 3a
Design Checklist for Water and Sewer for Building Developments;

Customer Information Handout 3b
Design Checklist for Water and Sewer for Extensions and Subdivisions;

Customer Handout Multi-metering
Multi-metering of Water Supply for Unit Developments;

Water Services Guidance to Achieving Active Frontages
The purpose of this document is to provide guidance in meeting Central Darwin active street requirements in regards to water and sewerage services;

Water Service Connection Templates Updated Oct 2015

Sewer Service Connection Templates Updated Dec 2015

Application forms

A series of application forms that facilitate a proponent's application for connection to Power and Water's infrastructure.

Expression of interest - Water and sewerage

Application for water meter - multi metering

Application for connection of a building to sewer

Application for water meter - 25mm and greater and dual services

Handover request form

Field Return of tests and measurements

Development works permit (DWP)

Request connections form

Clearance request form

Bulletins

Procedural Bulletin 2003 - 2 (December 2003)
Details the new procedure for connections to and work on Power and Water's water supply and sewerage infrastructure. The new procedures are now in use.

Procedural Bulletin 2003 - 1 (September 2003)
Details the proposed procedure for connections to and work on Power and Water's water supply and sewerage infrastructure. It is proposed that the new procedures be implemented on 1 December 2003. Feedback is sought from stakeholders by COB 31 October 2003. The procedures are now in use - refer Procedural Bulletin 2003-2.