Katherine region - Repairs, maintenance and new works for mechanical power station equipment in remote communities

Contract number:  PRK00298-17
Business unit owner:
Remote Services

Contract dates: 19 June 2017 to 18 June 2020

Description of services

A general outline of the work to be carried out under the contract comprises: but is not limited to:

  • testing, calibrating and certification of the installed diesel fuel meters.
  • installation, repairs and maintenance of bulk diesel storage tanks, diesel transfer pumping systems and associated pipe work.
  • mechanical and electrical installation of diesel generating sets, ranging from 50kw to 1.5 megawatt, electrical output, including remote radiators and exhaust, fuel, pneumatic and oil systems.
  • construction, repairs and maintenance of Power and Water’s related assets on aboriginal and remote communities.

The site of the Works in which the Superintendent shall require the works to be carried out is in remote communities in the Katherine Region, including, but not limited to the following:

Barunga                               Beswick                                  Borroloola                        Bulman

Daly Waters                         Jilkminggan Manyalluk Kalkarindji/Daguragu

Lajamanu                             Larrimah                                  Minyerri                          Mataranka

Ngukurr                                Rittarangu/Urapunga               Pine Creek                     Robinson River

Timber Creek                       Bulla Kildurk/Amanbidji           Yarralin

Pigeon Hole                         Gorge Camp                            Gilwi                                Wandangula

Kybrook                                Weemol Binjari

Current suppliers
Name Location (State)Category/Region
Goshawk Contracting NT N/A
Crowhurst Engineering NT N/A
Southern Cross Station Services NT N/A
Can I apply to become a panel member?

The panel will remain closed for a period of 12 months unless Power and Water determines the size of the panel is inadequate. The anniversary date is 19 June 2018.

Power and Water may appoint additional contractors to the Panel under the same assessment criteria contained in the original RFT.

For more information: Email pwc.procurement@powerwater.com.au