Contract details
Contract number PRA00488-18
Business unit ownerWater Services
Contract dates5 September 2018 to 4 September 2021

About this contract

A general outline of the work to be carried out under the contract comprises of the CCTV inspection, cleaning and Vacuum Tanker services for both planned and responsive work includes, but is not limited to the following:

  • CCTV inspection services using colour closed circuit television (CCTV) inspection to record the internal condition of the pipes in digital format using WinCan
  • Conduit Evaluation Report (defect coding) using WinCan of all lines CCTV inspected
  • internal visual inspection of maintenance holes using the WinCan manhole report and or the manual report format
  • cleaning services comprising jet cleaning, root cutting or vacuum cleaning, or a combination of methods, to clean the sewer pipes
  • vacuum tanker services comprising supply of vacuum tanker(s) to remove sewage / debris from pump stations and maintenance holes as directed.
  • Additional Works – Minor sewer system repairs as directed

The sites of the works is remote communities across the Northern Territory.

NameLocation (state)Category/region
 Akron Group NT Pty LtdNT N/A
 Pipeline Renovations Pty Ltd T/as Renoflo NT N/A

The panel will remain closed for a period of 12 months unless Power and Water determines that owing to changed circumstances the size of the panel is inadequate.

First anniversary date - 5 September 2019

Power and Water may appoint additional members to the panel under the same assessment criteria contained in the original Request for Tender.

Contact details

For more information about this panel contract, please contact pwc.procurement@powerwater.com.au

Return to supplier lists and panel contracts