Network Connection Technical Code
The Network Connection Technical Code sets out the technical requirements which apply to the design and operation of all plant and equipment which is connected to the electricity network. It is particularly applicable to generators and large loads, and covers:
- Network performance criteria, including frequency, quality of supply, stability, load shedding, reliability, steady state criteria, and safety and environmental criteria;
- Technical requirements of users' facilities, including the connection of generators and loads, and protection requirements;
- Inspection, testing, and commissioning;
- Power system security; and
- Metering.
Network Connection Technical Codes - April 2003 PDF 815 kb
Network Planning Criteria
This document presents the planning criteria that are applied to ensure that Power and Water's networks:
- Meet high safety standards;
- Provide a high quality, reliable, and secure electricity supply;
- Meet environmental standards; and
- Optimise equipment utilisation.
Network Planning Criteria - April 2003 PDF 229 kb