back
home
forwards
| Power | Water & Sewerage | Drawing Procedures | Help |  

DRAWING PROCEDURES

This manual has been prepared in order to create standardisation and uniformity for drawing management within Power and Water.

It is important that uniform practices and procedures are adopted to achieve an efficient and straight forward drawing management system. Personnel should therefore familiarise themselves with the procedures enclosed, particularly those relating to your work.

This manual will be under review to establish improved methods and procedures and feedback is encouraged from Power and Water personnel, consultants and contractors with regards to suggested improvements. It will be necessary as the situation dictates to amend or revise procedures.

Suggestions, information or for any queries relating to these procedures, please contact Drawing Services.

Procedure No Title No of Pages Amdt
00 Overview of Drawing Instructions 3 1
00A Overview of Drawing Contractor Safety 2 1
00B Drawing Instructions for PWC Project Leader (Officer) in relation to PWC Consultants 2 1
00C Drawing Instructions for PWC Consultants 2 1
01 Standard Drawing Frames 1 1
02 Drawing Title Block Format - work instruction 2 1
03 Issuing Drawing Numbers - work instruction 1 1
04A Microstation Element Attributes and Symbology work instruction 3 1
04B Acceptable AutoCAD File Format, Symbology and Settings 1 1
05 Drawing Amendment Notations 1 1
06A Transmission and Distribution - Electrical Layout Design Symbols 3 1
06B Electrical Standards Symbols work instruction 2 1
06C High Voltage System Diagram Symbols 5 1
06D Schematic Drawing Structure and Standards for Technology work instruction 8 1
06DA Schematic Drawing Structure and Standards for Technology - Appendix A - Device Function Numbers BS3939 7 1
06DB Schematic Drawing Structure and Standards for Technology - Appendix B - Device Function Numbers BS3939 2 1
06DC Schematic Drawing Structure and Standards for Technology - Appendix C - Circuit and Wire Identification Code AS2067 2 1
07A Water and Sewerage Layout - Design Symbols 4 1
08A Serviced Land Availability Plan (SLAP) work instruction 7 1
08B SLAP Drawing File Management - DIPE Server Maintenance and Burning CDs 3 1
08C SLAP Level and Folder Management 2 1
08D Surveying Underground Service Locations for the Serviced Land Availability Plan (SLAP) 4 1
09 Australian Standards for Drawing Practice and Symbols 4 1
* The above Drawing Procedures are multiple-page PDF files best viewed with the Adobe Acrobat Reader software. For further documentation, refer to the software help page.

Power and Water Standard Drawing Frames
The drawing frames specified in Procedure 01 are available in the Microstation v8, AutoCAD v12 and AutoCAD v2004 formats upon request to Drawing Services, tel: 89857141.

Power and Water Standard Cell Libraries
The cell libraries specified in Procedure 6A, 6B, 6C, 6D, 7A and 8A are availble in Microstation v8 and v5 formats upon request to Drawing Services, tel: 89857141.

contact us
| amendment bulletins | legal disclaimer | site map | contact us |