| Procedure No |
Title |
No of Pages |
Amdt |
| 00 |
Overview of Drawing Instructions |
3 |
1 |
| 00A |
Overview of Drawing Contractor Safety |
2 |
1 |
| 00B |
Drawing Instructions for PWC Project Leader (Officer) in relation to PWC Consultants |
2 |
1 |
| 00C |
Drawing Instructions for PWC Consultants |
2 |
1 |
| 01 |
Standard Drawing Frames |
1 |
1 |
| 02 |
Drawing Title Block Format - work instruction |
2 |
1 |
| 03 |
Issuing Drawing Numbers - work instruction |
1 |
1 |
| 04A |
Microstation Element Attributes and Symbology work instruction |
3 |
1 |
| 04B |
Acceptable AutoCAD File Format, Symbology and Settings |
1 |
1 |
| 05 |
Drawing Amendment Notations |
1 |
1 |
| 06A |
Transmission and Distribution - Electrical Layout Design Symbols |
3 |
1 |
| 06B |
Electrical Standards Symbols work instruction |
2 |
1 |
| 06C |
High Voltage System Diagram Symbols |
5 |
1 |
| 06D |
Schematic Drawing Structure and Standards for Technology work instruction |
8 |
1 |
| 06DA |
Schematic Drawing Structure and Standards for Technology - Appendix A - Device Function Numbers BS3939 |
7 |
1 |
| 06DB |
Schematic Drawing Structure and Standards for Technology - Appendix B - Device Function Numbers BS3939 |
2 |
1 |
| 06DC |
Schematic Drawing Structure and Standards for Technology - Appendix C - Circuit and Wire Identification Code AS2067 |
2 |
1 |
| 07A |
Water and Sewerage Layout - Design Symbols |
4 |
1 |
| 08A |
Serviced Land Availability Plan (SLAP) work instruction |
7 |
1 |
| 08B |
SLAP Drawing File Management - DIPE Server Maintenance and Burning CDs |
3 |
1 |
| 08C |
SLAP Level and Folder Management |
2 |
1 |
| 08D |
Surveying Underground Service Locations for the Serviced Land Availability Plan (SLAP) |
4 |
1 |
| 09 |
Australian Standards for Drawing Practice and Symbols |
4 |
1 |