Procedural Requirements

Technical Requirements - Procedural Requirements - Charging Requirements - Contact Us

| Procedural Documents | Procedural Fact Sheets and Guides | Procedural Application Forms | Procedural Bulletins |

Procedural Documents

Power and Water has developed and approved the following procedural documents that apply to development activity and with which a proponent must comply.

General Procedures for Development Activity 2003 67kb pdf

This document sets out the general procedures to be applied to development activity.

Guidelines for Developers and Consulting Engineers for the Provision of Water and Sewerage Infrastructure in Subdivisions 1993 247.52kb pdf

This document sets out the general procedures to be adhered to by proponents when designing infrastructure that is to be incorporated into Power and Water's network.

Procedural Factsheets and Guidelines

A series of documents that provide advice to proponents to assist in meeting Power and Water’s procedural requirements. A number of these fact sheets have both technical and procedural elements and appear on both the Technical and Procedural Requirement pages.

Customer Information Handout 1 43kb pdf
Checklist and notes for water / sewer services drawings for developments / subdivisions;

Customer Information Handout 2 58kb pdf
Checklist for design of water / sewer services for extensions and subdivisions;

Customer Information Handout 3 55kb pdf
Checklist for design of water / sewer services for building development;

Customer Handout Multi-metering 136kb pdf
Multi-metering of Water Supply for Existing units;

Customer Handout Multi-metering 116kb pdf
Multi-metering of Water Supply for New units; and

Procedural Application Forms

A series of application forms that facilitate a proponent’s application for connection to Power and Water’s infrastructure.

Application for Water Meter - 25mm and Greater (December 2003) 53kb pdf
This form should be completed by a landowner , or representative, and lodged with Land Development for assessment and approval.

Application for Connection of a Building to Sewer (December 2003) 32kb pdf
This form should be completed by a proponent's constructor (plumber) and lodged with Land Development for assessment and approval.

Request for Works on and Connections to Power and Water's Water Supply and Sewerage Infrastructure (December 2003) 33kb pdf
This form should be completed by a landowner, or representative, and lodged with Land Development to obtain a quotation for the works and/or connections.

Procedural Bulletins

Procedural Bulletin 2003 - 2 (December 2003)
This document details the new procedure for connections to and work on Power and Water's water supply and sewerage infrastructure. The new procedures are now in use.

Procedural Bulletin 2003-1 (September 2003) - Archive 175kb pdf
This document details the proposed procedure for connections to and work on Power and Water's water supply and sewerage infrastructure. It is proposed that the new procedures be implemented on 1 December 2003. Feedback is sought from stakeholders by COB 31 October 2003. The procedures are now in use - refer Procedural Bulletin 2003-2


The Connection Code documents may be under review please contact Land Development for information on current reviews.

Technical Requirements, Procedural Requirements and Charging Requirements

These documents are available in PDF format.