Power and Water Corporation is the sole provider of electricity, water supply and sewerage services to almost 80,000 customers across the Northern Territory ?¨C an area of more than 1.3 million square kilometres. Power and Water Corporation is the sole provider of electricity, water supply and sewerage services to almost 80,000 customers across the Northern Territory ?¨C an area of more than 1.3 million square kilometres. Power and Water Corporation is the sole provider of electricity, water supply and sewerage services to almost 80,000 customers across the Northern Territory ?¨C an area of more than 1.3 million square kilometres.

Stage Three

Stage Three:  Duplication of the East Point rising main

Treated effluent from the Ludmilla Wastewater Treatment Plant is currently discharged via the East Point outfall.  

In order to effectively cope with additional flows once wastewater is diverted from the Ludmilla outfall and the Darwin CBD, Power and Water will build another rising main to discharge via the East Point outfall.

Power and Water is currently preparing Public Environment Reports (PERs) for the duplication of the East Point rising main (stage three) and the extension of the East Point outfall (stage four).

The PER will assess and determine how best to manage any environmental impacts associated with duplicating the rising main to East Point and extending the East Point outfall.

The timing of construction for these works will depend on the outcome of the PER.

Documents

Public Environmenal Report - Stage 1: East Point Outfall Effluent Rising Main - Full document

Cover page and table of contents

1        Introduction 1

2        Description of the Proposed Development 22

3        Alternatives 38

4        Existing Environment 41

5        Potential Impacts 72

6        Preliminary Risk Analysis 82

7        Mitigation, Management and Monitoring 92

8        Marine Water and Sediment Monitoring Program 104

9        Public Involvement and Consultation 108

10      Acknowledgements 115

11      References  117

Appendix A NRETAS Guidelines

Appendix B Waste Discharge Licence No. 149 and 150

Appendix C Detailed Design Alignment of the Duplicated ERM

Appendix D Geotechnical Investigation along proposed alignment

Appendix E Acid Sulphate Soil Investigation

Appendix F Species List

Appendix G EPBC Database Search

Appendix H Archaeology and Heritage Assessment

Appendix I AAPA Certificates

Appendix J Power and Water Land Management Procedure

Appendix K Chemical Management, Assessment, Purchase, Handling, Storage, Disposal and Training Requirements Procedure

Appendix L Contractor OHSE Management Procedure

Appendix M Emergency Response Procedure

Appendix N Hazard/Incident Recording, Reporting and Investigation Procedure

Appendix O Risk Management Procedure

Appendix P Draft Biting Insects Management Plan

Appendix Q Draft Water and Sediment Monitoring Program

Appendix R Waste Management Procedure